Kohler K-2971 Guía De Instalación Y Cuidado página 10

Ocultar thumbs Ver también para K-2971:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Rotate stops 1/4 turn.
7. Installation Checkout
Install caps to the temporary bath and shower nipples.
Turn on the hot and cold water supplies, and check the new
installation for leaks.
Remove the caps from the temporary nipples.
Remove the plaster guard.
Turn the valve stem to the "On" position, and cycle the control
through its operating range. Check for leaks.
For bath and shower installations, check the diverter system from
spout to showerhead.
Turn the valve off.
If the valve has stops, rotate both stop adjustments fully
clockwise.
Turn the valve on and verify that water does not run.
Turn the valve off and rotate both stop adjustments fully
counterclockwise.
Reinstall the plaster guard.
1205550-2-C
10
Kohler Co.
Tabla de contenido
loading

Tabla de contenido