Luminance Brands Kathy Ireland Home MIDWAY ECO LED CF955LBS00 El Manual Del Propietario página 8

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

3. Ceiling Fan Assembly
3.9
Reinstall the Hanger Ball (Figure 9) on the Downrod as
follows:
Route the Two 80" Motor Wires through the Hanger
Ball and slide the Hanger Ball over the Downrod.
Position the Pin through the Two Holes in the Downrod
and align the Hanger Ball so the Pin is captured in the
Groove in the top of the Hanger Ball.
Pull the Hanger Ball up tight against the Pin and
securely tighten the Set Screw in the Hanger Ball.
A loose Set Screw could create Fan wobble.
WARNING
!
It is critical that the pin in the hanger ball is properly
installed and the set screw securely tightened. Failure
to verify that the pin and set screw are properly
installed could result in the fan falling.
3.10
The Fan comes with Black and White Wires that are
80" long.
Measure up approximately 6 to 9-inches above top of
Hanger Ball / Downrod Assembly (Figure 10).
Cut off excess Wires and strip back insulation 1/2-inch
from end of Wires.
Carefully turn the Partially Assembled Ceiling
Fan upside down and place onto the foam pad in
preparation for mounting the Fan Blades and Light
Fixture.
(Continued)
PIN
HANGER
BALL
Figure 9
1/2-INCH
6 TO 9
INCHES
Figure 10
8
SET SCREW
DOWNROD
CEILING
COVER
BLACK WIRE
WHITE WIRE
HANGER BALL
HANGER BALL/
DOWNROD
ASSEMBLY
DOWNROD
ETL Model No.: CF955L
Tabla de contenido
loading

Tabla de contenido