Using With Carrying System - Stihl BGA 100 Manual De Instrucciones

Ocultar thumbs Ver también para BGA 100:
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 28
7 Adjusting Blower for User
3
The length of the connecting cable can be adjus‐
ted by making a loop on the backplate (3) or at
one side (4).
► Arrange the connecting cable so that it is as
short as possible without hindering your work.
7.1.2
Fitting and Adjusting the Carrying Sys‐
tem
► Put the battery on your back.
► Close buckle (2) on the waist belt.
► Close buckle (1) on the chest strap.
3
► Tighten the straps until the waist belt fits
snugly on your hips and the back padding is
against your back.
► Thread the end of the waist belt through the
loop (3).
► Fit the hip pad as described in the instructions
supplied with the hip pad.
0458-711-9821-C
4
1
2
► Adjust the strap (1) so that the carabiner (2) is
about a hand's width below your right hip.
7.2

Using with Carrying System

7.2.1
Fitting and Adjusting the Connecting
Cable
The connecting cable can be fitted and adjusted
to suit the user's size and the application.
1
The connecting cable can be fitted through the
following openings:
– the upper left opening (1)
– the upper right opening (2)
– the lower left opening (3)
– the lower right opening (4)
1
2
5
6
► If the connecting cable is fitted through the
upper left opening (1) or the upper right open‐
ing (2):
► Open the press studs (5).
► Lay the connecting cable over the shoulder
strap (6).
► Close the press studs (5).
► If the connecting cable is fitted through the
lower left opening (3) or the lower right open‐
ing (4): Seal the opening you use (3 or 4) with
the hook and loop fastener (7).
English
1
2
3
3
4
7
4
21
loading