Kohler K-1018 Guia De Instalacion página 7

Ocultar thumbs Ver también para K-1018:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

6. Pre-fit the Walls
NOTE: The module must be plumb and level. The shower door will not install properly if the module is
not plumb and level.
Carefully move the wall assembly onto the receptor.
Align the receptor and the walls.
Check and align the walls for plumb and level.
If walls are not plumb and level, go to the "Shimming Procedures" section.
Predrill the nail-in flanges on the stud centers and around the walls on 8" (20.3 cm) centers. Do not
nail the walls in place at this time.
Kohler Co.
Align these two
surfaces on both walls.
8" (20.3 cm)
7
Align these vertical
surfaces on both walls.
1024937-2-C
Tabla de contenido
loading

Este manual también es adecuado para:

K-9455

Tabla de contenido