THE BOLD LOOK OF KOHLER K-1914 Guia De Instalacion página 35

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Seal/Drain System Electrical Connections (cont.)
NOTE: Refer to the "Heated Surface Electrical Connections (if equipped)" section if your product is
equipped with the heated surface feature.
Connect both the controller and blower power cords to a dedicated 120 V GFCI or RCD protected
outlet and turn on the main power supply. If a UPS has been installed, connect the door power to it
following the directions supplied with the UPS.
NOTE: If any of the actions below fail to occur, consult the "Troubleshooting" section of this guide.
Raise the door. Make sure the drain valve closes and the door inflates when the door latches.
IMPORTANT! Both limit switches must make contact for the drain valve to close and the seal to inflate.
Do not over adjust.
Adjust the limit switch to make steady contact with the latch pin if needed. Consult the "Adjust the
Limit Switch" portion of the "Adjust the Bath Door" section for illustrations and instructions.
Close the footwell floor drain and fill the bath with water to the overflow. Confirm the level probes
in the bath are covered by water within 2 minutes of raising and latching the door. If not the door
will open as a precautionary measure.
Check for leaks. Pay particular attention to the area around the door. There should be no indication
of leaking if no splashing or water movement is present.
If leaking is observed, drain the bath and clean any debris off the seal. Test for leaks again.
If leaking is still observed, adjust the door inward using the slots in the pulley assembly.
Test again and continue these steps or consult the "Troubleshooting" section included in this
document.
Do not drain the bath. Proceed to the next section to confirm airjet operation.
Kohler Co.
35
1128535-2-F
Tabla de contenido
loading

Tabla de contenido