Commissioning; Operation; Maintenance - Schneider Airsystems MAS-Dryer 3-10 Manual De Instrucciones Original

Ocultar thumbs Ver también para MAS-Dryer 3-10:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 20
GB
MAS-Dryer 3-10
15
Ventilator motor
16
Ventilator
17
Precooler
8

Commissioning

Observe the safety instructions!
8.1
Transport
• Depressurise compressed air cold dryer
and place in vertical position prior to trans-
porting
8.2
Conditions at the installa-
tion location
• Rooms: as dust-free as possible, dry, well
ventilated.
8.3
Before first use
1. Carry out a visual inspection.
2. Check the electrical connection.
8.4
Assembly
See MAS instruction manual.
10

Maintenance

Observe the safety instructions!
Interval
No later than
Weekly
After 5 days of operation Clean outside of compressed air cold
Monthly
After 20 days of operation Clean refrigerant condensator
Every
three
After 60 days of operation Clean float diverter
months
10.1
Before each maintenance
task
1. Depressurise MAS.
2. Switch off the compressed air cold dryer
at the ON/OFF switch. Unplug the power
plug.
3. Remove the service cover (item 05).
4. Push the valve knob on the float diverter
down until compressed air escapes (Fig.
2a).
10.2
Clean refrigerant conden-
sator
1. Remove housing.
8
8.5
Electrical connection
• The mains voltage must match that speci-
fied on the rating plate.
• Electric protection according to technical
data.
• Observe VDE regulations 0100 and 0105.
When using extension cords: cable cross-
section:
min.
length: 3 m.
9

Operation

Observe the safety instructions!
9.1
Insert
1. Switch on the compressed air cold dryer
at the ON/OFF switch (item 03).
2. The compressed air cold dryer is ready to
operate after 10 min.
9.2
After use
Switch off the compressed air cold dryer at
the ON/OFF switch.
Tasks
dryer using vacuum cleaner
2. Clean refrigerant condensator using a
brush.
3. Attach housing (item 04) and service
cover.
10.3
Clean float diverter
1. Remove housing.
2. Turn the condensate collection vessel an-
ticlockwise to remove (Fig. 2a).
3. Remove the condensate drain hose from
the condensate collection vessel.
4. Empty the condensate collection vessel
and clean.
5. Installation is in reverse order.
6. Attach service cover.
2,5 mm²;
max.
See
chap-
ter
10.2
10.3
cable
Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

H 611 000

Tabla de contenido