Install The Plumbing - THE BOLD LOOK OF KOHLER K-9025 Guia De Instalacion

Rendija para el drenaje
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

4. Install the Plumbing

NOTE: Provide access to all plumbing connections to simplify future maintenance.
Locate rough plumbing for the drain according to the correct model's roughing-in dimensions.
NOTE: If plumbing is to be located on the unfinished stud wall, install the supplies after the receptor is
installed.
Position the plumbing according to the roughing-in information. Cap the supplies and check for
leaks.
Install a drain pipe according to the roughing-in information.
Strap the supply connections to the stud framing.
If possible, provide an access at the back of the plumbing wall for servicing the supply and waste
piping.
Install the shower valving according to the manufacturer's instructions. Do not install the trim at
this time.
5. Prepare the Receptor
WARNING: Risk of product or property damage. Do not support the shower receptor by the rim. The
weight of the shower receptor should be supported by the bottom.
CAUTION: Risk of property damage. If a watertight seal on the drain is not obtained, water damage
to the subfloor may occur.
Install the drain to the shower receptor according to the drain manufacturer's instructions.
Clean the receptor to reduce the risk of surface damage.
Place a clean drop cloth or other similar material into the bottom of the receptor. Be careful not to
scratch the surface of the unit.
1009404-2-D
6
Kohler Co.
Tabla de contenido
loading

Este manual también es adecuado para:

K-9026

Tabla de contenido