Prepare The Site - THE BOLD LOOK OF KOHLER K-9025 Guia De Instalacion

Rendija para el drenaje
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Alcove Stud Construction

1. Prepare the Site

Ensure that the installation area is clean and free of all debris. If remodeling, remove all finished
wall material to expose the framing and remove all floor coverings to expose the subfloor.
Inspect the flooring at the installation site. Repair as necessary.
NOTE: The receptor weighs approximately 175 lbs. (79 kg). Provide adequate plywood support for the
receptor.
Make sure the sub and finished floors are flat and level.
Cut the Floor – Drop-in Installations Only
Carefully measure dimensions B and C (see illustration).
Subtract 1/2" (1.3 cm) from dimension C and 1/4" (6 mm) from dimension B. These new
measurements determine the size of the recessed hole.
Measure dimension A (see illustration) to determine the depth of the recessed hole. The receptor feet
must rest on the subfloor, and the receptor must be level.
1009404-2-D
Finished Stud Framing (with receptor)
Shower
Receptor
4
1" (2.5 cm) Plywood Subfloor
Adequate
Plywood
Support
B
C
A
Kohler Co.
Tabla de contenido
loading

Este manual también es adecuado para:

K-9026

Tabla de contenido