Greenlee Shear 30T Instrucciones De Instalación página 4

Ocultar thumbs Ver también para Shear 30T:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Installing New Components (cont'd)
10. Apply Loctite
(9) to threads in adapter and install
®
spacer and SEMS screw (6). Tighten with 10 ft-lbs
of torque.
11. Apply Loctite
(9) onto new flange screw (4) as
®
shown in Fig. 11 and tighten the swing arm back
with 10 ft-lbs of torque.
12. Insert Hydraulic Cylinder (A) back into the Cassette
Unit (B) as shown in Fig. 12.
A
4455 Boeing Drive • Rockford, IL 61109-2988 • USA • 815-397-7070
©2019 Greenlee Tools, Inc. • An ISO 9001 Company
www.greenlee.com
Figure 10
Figure 11
Figure 12
13. Apply Loctite
shown in Fig. 13 and tighten the rails and frame back
with 35 ft-lbs of torque.
3
14. Allow unit to cure for 24 hours before use.
B
USA Tel: 800-435-0786
Canada Tel: 800-435-0786
Fax: 800-451-2632
Shear 30T Threadlocker Kit
(9) onto new cap screws (2 & 3) as
®
2
Figure 13
International Tel: +1-815-397-7070
Fax: 800-524-2853
Fax: +1-815-397-9247
Tabla de contenido
loading

Tabla de contenido