SATA AE5302 Manual Del Uso página 39

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 234
220v
Incoming power line, 4mm2
Grounding line, 2.5mm2
380v
Incoming power line, 2.5mm2
Grounding line, 1.5mm2
Air supply pressure, 6~8kg
Note:
1 ) The foundation pits shall be 340mm deep with flat surfaces, unevenness no greater than 1.5mm, vertical walls, and
upper edges covered with 40*40 angle steel
2) The concrete shall be reinforced with steel bars, and have a thickness greater than 250m and a compressive strength
no lower than 25MPa. The grade of the foundation concrete shall be greater than C25
3) A Ф50mm PVC pipe shall be buried 340mm deep between the two places respectively for the distribution box of the
station and the control cabinet of the lift
AE5302/AE5302-3
Foundation diagram:
中文
4T In-ground Scissor Alignment Lift
AE5302/AE5302-3
EN
DE
RU
KO
PT
JA
ES
39
loading

Este manual también es adecuado para:

Ae5302-3