SATA AE5302 Manual Del Uso página 47

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 234
2) On the installation site, power supply and air supply shall be provided and connected to the control cabinet station in
advance, and the ceiling height shall not be less than 4000mm. It is recommended to install the lift in pits and construct the
foundation as required in Fig. 17.
3) Nevertheless, the lift can be installed on any indoor floor, provided that the floor meets the leveling requirements and has
enough bearing capacity (25MPa).
4) During installation, there shall be sufficient light to ensure the safe operation of commissioning and repair. Strong light
shall be avoided, because it would affect personnel sight and cause eyestrain.
The cargo shall be inspected upon arrival for completeness before installation. The movement and installation of the lift shall be
carried out by professionals. For the transport and storage of the lift, refer to "Transport and Storage" on page 14.
3.2.2 Installation of lifting platforms:
1 ) Insert sizing blocks under the platform and lift the lifting platform with a forklift or other lifting equipment (Fig. 18) to
about 1000mm, so as to ensure that the mechanical safety device is activated and locked.
AE5302/AE5302-3
Fig. 18
中文
Fig. 17
EN
DE
RU
KO
PT
JA
ES
47
loading

Este manual también es adecuado para:

Ae5302-3