During installation, carry-out a good machine levelling, which is a prerequisite for a correct
operation thereof.
The Manufacturer cannot assume any responsability for any damage to persons or
property deriving from the non-observance of the above-specified norms.

ELECTRICAL CONNECTION

Before connecting the machine,
check to make sure the voltage
outlet of the mains is
the same as the voltage specified
on the data plate of the machine.
A main switch must be installed between
the mains and the machine. This safety
measure
also requires that the minimum distance
between the switch contacts is at least 3
mm and the
disconnection on all poles according to EN
60204 (VDE 113).
Fuses on the main switch must be 16 A .
The mains must be wired to be able to
handle
the
current
machine.The system must
also be provided with a proper ground lead
in accordance with the existings norms.
The electric
cable must be of the following
type H07RN-F.
For the right choice of the cross section
area refer to the following table:
Cross Section area
mm²
0,75
1
1,5
2,5
drawn
by
the
Total loading
A
< 6
6 ÷ 10
10 ÷ 16
16 ÷ 25
The electrical safety of this equipment is
only assured if it is connected as follows.
It is necessary to connect the equipment to
an
effective
ground
specified by the
electrical safety regulations in force.
Chack that this basic requirement is
complied with and, in case of doubt, ask for
a careful check of
the installation by a qualified personal.
In addition, the equipment shall be part of
an equipotential system, the effectiveness
of which
should be checked according to the
regulations in force.
The connection should be made at the
screw marked by the respective label
located on the
equipment back side (
THE
MACHINE
CONNECTED WITH AN EFFECTIVE
GROUND CLAMP.
The manufacturer declines any
responsibility for any damages
caused by lack of an effective
ground installation.