Shindaiwa SP45BPE Manual De Uso Y Cuidado página 4

Pulverizador de mochila
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

SPRAYER COMPONENTS & USE INFORMATION, Continued
INSTALLING THE PUMP HANDLE
The sprayer includes all hardware necessary for installing the pump handle. Install the pump handle
into the base (A). Center the hole in the handle between the cut-out on the bottom of the tank base (B).
Push the "C" clip over the pump handle while aligning the nub on the clip with the hole in the handle
(C). Slide washer over pump linkage (short end) (D). Slide pump arm linkage (short end) through
pump handle at the bottom of the tank (D & E). Slide a second washer over the linkage and insert the
cotter pin through the hole in linkage (E). Position ball over top of pump (F). The pump assembly can
be rotated to orient the pump outlet into desired position (G). Rotate handle down until ball is seated
in top of pump (F and G). Tighten pump retainer nut (F). Do not over tighten. Press boot over retainer
nut (H). Ensure pump locking nut is tight (G).
Pump
Handle
Pump Arm
Linkage
F
Boot
Retainer
Nut
Ball
HANDLE ASSEMBLY FOR 3.0 GALLON
For 3.0 G/11.4L handle assembly,
slide upper handle into lower handle.
Line up 1st hole (small hole) on both
handles. Push bolt thru, attach nut to
bolt then refer to Installing the Pump
Handle Instructions above.
A
A
D
Pump
outlet
Pump
Locking Nut
B
E
G
H
Nut
3E
C
"C" Clip
Lower Handle
Bolt
Upper
Handle
Tabla de contenido
loading

Este manual también es adecuado para:

Sp30bpe

Tabla de contenido