Installation; Wiring; Reset And Setting Of Regulator - Danfoss SH-E01 Guia De Instalacion

Ocultar thumbs Ver también para SH-E01:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 27

3.0 Installation

3.1 Wiring

The wiring to the regulator must be connected to the back plate
terminal strip:
Designation
Ground
Neutral
Phase
Sensor in solar collector
Sensor, common
Sensor in tank
Alarm
Pump, phase
Supply voltage

3.2 Reset and setting of regulator

Set the regulator via the DIL switch on the back.
Factory settings:
Start-up temp. diff erential
Pump exercise
Reset
*) Pump stop temperature diff erential is fi xed: 2°C
**) Pump exercise sequence: 1 min/14 days
Danfoss Heating
Terminal
N
L
T1
COM
T2
AL1, AL2
P1
L1, max. 2(1)A
N
L
N
L
T1 COM T2
5 °C*
ON**
OFF
AL1 AL2
AL
P1
N
Setting range
5 - 10 - 15 - 20 °C
ON-OFF
GB
D
DK
F
ES
PT
5
Tabla de contenido
loading

Tabla de contenido