Once the hood is in position it is fastened
using the capscrews in the interior of the
hood as shown in Figs 2 and 3.
At the same time drill the holes going
through the veneer of the support (roof) so
that the sealing capscrews can be screwed in
The interior screw is positioned in the
and the tube can be fastened.
male neck of the tube
The interior screw is placed in
the male neck of the tube.
EXTRACTION OF THE
ELECTRICAL CABLE
Extract the existing
electrical cable through
the nearest aperture
situated at the bottom of
the equipment. The
power to light up the
chimney goes through
Capscrews
M6x12 DIN 914 (3
units).
Access from the
interior to screw in
the capscrews.
PUTTING THE STONES IN PLACE
Put the stones inside the base
46