Installation; Before You Begin - Bosch NGT Manual Del Usuario

Ocultar thumbs Ver también para NGT:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Installation

Before You Begin

Tools and Parts Needed
Parts Included
General Information
Overall Dimensions
Preparation
Electrical Requirements
Gas Requirements
1) Phillips Head Screwdriver
2) Drill with 1/4" (6.35mm) bit
3) Tape Measure
1) Foam tape
2) Hold down brackets (4)
3) Screws, #10-32 x 2 1/2" (63.8mm) (4)
4) Sheet Metal Screws, #8 x 3/8" (9.5mm) (4)
5) Washers (4)
6) Rubber Grate Foot (1 extra foot is included for future use if required)
7) Burner Grates
30" models: (2)
36" models (3)
8) Burner Caps
30" models: (4)
36" models: (5)
9) Regulator
If parts are missing or damaged, call the number or write to the address listed
inside the cover.
Table 1: Overall Dimensions
30" Models
Width
31" (787.4 mm)
(Side to Side)
Depth
21" (533.4 mm)
(Front to Back)
Height
4" (Below Countertop)
(Top to Bottom)
This appliances requires a 60 Hz, 15 Amp, 120 VAC connection. Plan the installa-
tion so that the power connection is accessible from the front of the cabinet.
Supply Pressure:
36" Models
37" (939.8 mm)
21" (533.4 mm)
4" (Below Countertop)
English 3
Tabla de contenido
loading

Este manual también es adecuado para:

Ngp

Tabla de contenido