INSTRUCTION FOR BASIC OPERATION
1. Swing the heating unit to
the rear and turn the switch to
the left position to turn on the
heater. The heater indicator
light will come on when the
heater is on. It will require
approximately three minutes
to preheat. Preheating the
unit before use is especially
important when using materials
.040 or thinner. These materials
heat very quickly and it is best
to have the heater temperature
stabilized first.
2. Open the top plate by pulling
the latch knob. Place a sheet of
forming material on the bottom
plate. Lower the top material
plate over the material and
engage the latch.
5