6.
Prepare the Site - Deck-Mount
1
Bath Deck
Support Plate
Comptoir arrière
Plaque de support
Cubierta de bañera
Placa de soporte
3
1-1/2" D.
5-15/16"
(15.1 cm)
NOTE: Provide an access panel under the bath deck for water supply connections.
NOTE: Reference the "Rough-In - Deck-Mount" section of this guide before
proceeding.
Place the support plate onto the bath deck where the water supply tubing will be
located. (1)
Trace the holes of the support plate at this location to set the centerline distances
for the water supply tubing.
Verify that the location of the support plate will allow the spout of the bath filler
to reach over the bath deck and into the bath. (2)
Verify that the distance between the centerline of the holes on the support plate
will be 5-15/16" (15.1 cm) ±0. (3)
NOTE: If a hole saw will be used to drill the holes, drill outside the line of the
marked holes.
Drill the marked holes on the bath deck using a 1-9/16" drill bit or 1-1/2" hole
saw. Remove any debris from the drilling process.
Verify the diameter of the drilled holes will accommodate the diameter of the
tubes. Adjust the hole diameter slightly, if needed.
Secure the support plate to the unfinished bath deck with the eight (provided)
wood screws. (4)
1169172-2-A
2
Bath
Baignoire
Bañera
4
16
Check the reach.
Vérifier la portée.
Verifique el alcance.
Wood Screw
Vis à bois
Tornillo para madera
Kohler Co.