Complete The Installation - Kohler K–T948 Guia De Instalacion

Ocultar thumbs Ver también para K–T948:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Aerator

6. Complete the Installation

NOTE: The illustration is for a typical three-way installation.
Turn the valve fully counterclockwise to the off position.
Remove the aerator assembly from the spout by turning it
counterclockwise.
Turn on the main water supply.
Turn the valve to the center and run water for approximately one
minute to flush the system.
Check all connections for leaks.
Reinstall the aerator.
1031652-2-C
10
Kohler Co.
Tabla de contenido
loading

Este manual también es adecuado para:

K–t949K–t950K–952K-967K-968

Tabla de contenido