Heatworks 1X Guía De Instalación Y Manual Del Usuario página 11

Ocultar thumbs Ver también para 1X:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

13) Using the supplied zip
tie, secure the wiring in
place by sliding one end
of the tie through the
plastic anchor, looping it
around all of the power
wires, and then back into
the locking mechanism of
the tie.
14) The secured wires
should look as shown in
Figure 5.10. Trim off any
excess tie material using
diagonal cutters.
15) The completed
electrical installation of
the MODEL 1X is shown
in Figure 5.11. Replace
the back cover and
secure with the four
screws.
For more information, please visit www.myheatworks.com.
16) Turn on power to the MODEL 2X by turning on the
associated breaker
YOU ARE NOW READY TO SET THE TEMPERATURE
Figure 5.9
Please continue to page 10
Figure 5.10
Figure 5.11
9

Capítulos

Tabla de contenido

Solución de problemas

loading

Productos relacionados para Heatworks 1X

Tabla de contenido