Victoria Arduino ATHENA LEVA Manual Técnico De Empleo página 24

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

To carry out the manual filling, before swit-
ching the machine on, turn the manual loading
tap 2 that is below the worktop.
Once the boiler is half filled, turn again the
manual loading tap 2 and switch the machine
on in order to activate the automatic level, also
check that the water inlet cock 1 and the auto-
matic level cock 3 are open.
Remark: a tap is turned open when turning the
3
lever it is parallel to the tap's body.
After about 20 minutes the machine will have
reached the working pressure that can be noti-
2
ced and taken from the double scale manome-
ter. To change the boiler working pressure, (and
also its temperature) according to the different
needs or characteristics of the coffee used, it is
necessary to remove the cups warming band,
the cups warming plate and the side right
panel and to turn the manostat regulation
1
screw, by turning it clockwise the pressure
22
Tabla de contenido
loading

Tabla de contenido