Electrical Connections & Fitting To The Tower; Up And Running; Four Point Final Checklist - Rutland 504 Windcharger Manual Del Usuario

Tabla de contenido
Rutland 504 Windcharger
Electrical Connection and Fitting to The Tower
1. Run the cable selected (see Fig 14) down the inside of the pole.
2. Select one of the basic wiring systems in Figs 3, 4 & 5 and follow the manual
provided with the selected charge regulator.
3. Connect the wind generator flying leads to the cable protruding from the tower
using the connector block supplied, taking care to observe polarity. Connect the
Windcharger + to cable + and windcharger – to cable –
Red is
+ Positive
Black is - Negative
4. Wrap the connection with insulation tape to secure/protect from environment.
Alternatively join the cables using a latching-type plug and socket.
5. Locate the wind generator into the tower whilst gently easing the cable from
the tower base to ensure the cable is not trapped. Secure the wind generator to
the tower using the button cap screws and shake proof washers provided,
tighten using the 6mm Allen key provided.

Up and Running

Four Point Final Checklist

Before raising and securing the wind generator:
1. Check the tightness of the tail fixing screws and generator mounting screws.
2. Check free rotation of the hub and yaw axis.
3. Check that the cable is not trapped.
4. Check that all electrical connections are secure and safe.
The wind generator can now be raised into position.
Take care to avoid all moving parts when raising and lowering the wind
generator.
When raised, secure the structure firmly in an upright position.
Caution-The performance of your Windcharger will be impaired if the pole is
not vertical.
Document No: SB-150 Issue B 17.02.10
9
Installation & Operation
Marlec Eng Co Ltd