Checking The Pressure And Losses; Filling The Magazine Of Sale; Before Starting Regeneration - Aqua SOFT GREEN TECH Manual De Instalacion Y Uso

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

CHECKING THE PRESSURE AND LOSSES

Before proceeding with the commissioning of the water softener, you MUST follow the
following steps to stabilize the pressure and expel the air nell'addolcitore:
1. Open two taps (or more) of cold water downstream of the softener
2. Place the bypass BYPASS position
3. Slowly open the supply tap general and let the water run until it runs regularly from the
taps open. There must be more air or that have irregular or phenomena called "water
hammer".
4. Place the bypass in NORMAL OPERATION. Action to be performed slowly to avoid too
rapid an increase in pressure nell'addolcitore.
5. Wait about 3 minutes, then open a hot water faucet until the flow becomes regular, then
close it.
1. Close all cold water faucets and check for leaks on new water connections made.

FILLING THE MAGAZINE OF SALE

Add at least a lot of salt 25 kg.

BEFORE STARTING REGENERATION

Start the first regeneration manually by holding the REGEN button until the valve will move to
the first position of regeneration.
This will allow the valve to expel all the micro dust and air inside.
Let the water from a faucet until it returns to normal. Press the button again REGEN to complete
all phases of the regeneration cycle, without waiting without waiting for the timetable for each
phase.
24
Tabla de contenido
loading

Tabla de contenido