Maintenance; Maintenance Plan - GF PA11 Instrucciones Para La Operación

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Instruction manual
9

Maintenance

CAUTION
Risk of injury and loss of product quality due to the use of spare parts not provided by
GF Piping Systems!
Risk of injury and damage to property.
 Use only original parts.
9.1

Maintenance plan

 Set maintenance intervals according to the operating conditions (e.g. actuating cycles,
medium, ambient temperature).
 Carry out the following maintenance tasks as part of the regular system inspection.
Maintenance interval
Regularly
For any questions about maintenance of the product, please contact your national
GF Piping Systems representative.
41
Maintenance task
 Check that actuator opens and closes
correctly
Maintenance
Tabla de contenido
loading

Este manual también es adecuado para:

Pa21

Tabla de contenido