ECO COUNTER-CURRENT EQUIPMENT
king glands (37) in place gently pull the two
conduits so that thay do not remain bent inside
the case. Lead the control conduit (22) to the
control cabinet and set it up inside the wall con-
duit. Put the air inlet valve (20) onto the end of
the suction tube (14), its design allowing it to be
fixed onto the wall above the water level.
If you cannot get to the back end of the housing
case then the suction and control conduits (14)
and (22) must be sealed from inside the hou-
sing case. Put the two packing glands PG16
(37) with the seals onto the conduits and pass
them through the packing gland holes and pro-
tection tubes (assembled before-hand in the
housing case. See (Fig. 3). Put the return inlet
unit next to the return pipe (31) and before
fixing the packing glands slide through the con-
duits, leaving the least possible length free to
fix the packing glands, so that when you intro-
duce the return inlet unit fully into the housing
case the conduits (14) and (22) don't bend.
Lead the control conduit (22) to the control
cabinet and assemble it inside the wall conduit.
Put the valve (20) onto the end of the suction
tube (14).
The propulsion outlet unit is situated right
against the pool wall, fix it in place using 4
screws depending on the thickness of the sur-
face finish.The assembly allows a tolerance of
0-70 mm.
Glue the PVC piping from the flange connec-
tion to the siting of the pump, the installation of
valves is recommended here for future maintai-
nance operations.
The pump is fixed onto the floor on cushions
and in a horitzontal position. The 2 outlets of
5
the pump will be connected to the tubes
coming from the housing case.
2c. Assembly of the unit in liner pools
For this installation, a set of fittings composed
(48), of the flange and sealing gaskets is requi-
red. Installation of the unit is the same as des-
cribed beforehand.
2d. Installation of the unit in pre-fabrica-
ted pools
For installation of the unit in pre-fab. pools,
a set of fittings (48), composed of a flange
and sealing gaskets is required. For
assembly instructions procede as descri-
bed beforehand.
3. ELECTRICAL INSTALLATION
The electrical installation must be made in
accordance with the regulations concerning
electrical protection in force in each country.
The installation should be made by an
authorised installer. Check that the voltage
coincides with the specifications plaque of the
pump. Use a power cable of 5x4 mm². for the
pump 3,3 kW., of 5x2,5 mm². for the pump 2,6
kW. and 3x2,5 mm². for the 1,5 kW. pump. For
protection, install 16 amp. fuses, and without
fail a circuit breaker of 25/0.03 A. (30 mA).
The control cabinet comes with the following
components: A thermal relay to ensure the pro-
tection of the motor, which must be correctly
regulated, according to the current consump-
ENGLISH
ECO CCE