11.0.1 Pre pa ra ti on for sto ra ge
If the ma chine is to be shut down for an ex tended time (lon ger
than 6 weeks), it should be placed stably on a pal let on a firm,
even sur face.
•
The stor age area should be dry and pro tected.
•
The am bi ent tem per a ture should be be tween 0°C / 32°F and
45°C / 113°F.
•
Be fore stor ing the ma chine
-
clean it thor oughly
-
check for leaks and dam age, and fix any prob lems.
-
cover it with a pro tec tive tar pau lin.
11.0.2 Re turn to ser vice
•
Be fore us ing the ma chine again, check for
-
leaks,
-
de fec tive or leaky hy drau lic hoses, and
-
any other dam age.
•
Re pair any prob lems found.
•
Check all screw joints and tighten them.
70
11. Stor age