Milestone ELPMBP05 Instrucciones De Instalación página 10

Kit de reemplazo de panel de cielo raso suspendido
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

ELPMBP05
B.
For ceiling structure from 4 - 7ft (1.2 - 2.1m) from
ceiling tray (A) (See Figure 13):
Route one end of cable (C) over truss and secure
to itself with wire clamp (G).
Route opposite end of cable (C) through both
channels in tray (A). Remove cable slack and
secure to itself with wire clamp (G).
C. For ceiling structure more than 7ft above tray (A):
Additional 1/8" diameter steel safety cable will be
required.
Attach cable to tray (A) per step 1.A or 1.B
1B
(G) x2
(C)
(G)
Figure 13
EXTENSION COLUMN INSTALLATION
WARNING:
Exceeding the weight capacity can result in
serious personal injury or damage to equipment! It is the
installer's responsibility to make sure the combined weight of
all components attached to the ELPMBP05 does not exceed
250 lbs (113 kg).
1.
Install 1-1/2" NPT or NPSM following ANSI/ASME B1.20.1
(Schedule 40, 0.154" minimum thickness steel or aluminum
- ASTM B221) threaded extension column (not included)
into extension column support until tight, with a minimum of
four threads engaged.
NOTE:
If installation instructions are not available, contact
Chief for assistance.
2.
Install one 10-24 x 1/4" button head screw (M) into
extension column support, tightening firmly against column.
(See Figure 14)
OPTIONAL: Install one 10-24 x 1/4" button head
security screw (N) through locking collar (P) into
extension column support, tightening firmly against
column.
10
(G)
(C)
NOTE:
Locking collar (P) is designed to spin, even when screw
(N) is tight.
(P)
(N)
(M)
(M)
2
(N)
Figure 14
3.
Reinstall remaining ceiling tiles as required.
Installation Instructions
Tabla de contenido
loading

Tabla de contenido