Emerson Rosemount Analytical 700XA Manual De Referencia página 104

Cromatógrafo de gas
Tabla de contenido
Funcionamiento y mantenimiento
4.
5.
6.
7.
8.
Figura 4-14:
LSIV - exploded view
98
Place new seals on the sample flow chamber assembly. Press the chamber and seals
back over the metering rod.
Place the actuation section in position on the heater section's headpiece.
Use the union coupling spacer to ensure that the union coupling is properly aligned
with the heater section's headpiece.
Use the union coupling wrench to retighten the union coupling over the heater
section.
Restart the sample flow. The GC can now be returned to service.
Tabla de contenido
loading

Tabla de contenido