Maintenance plan
Spindle centring (run-on delay)
Torque: Approx. 4 Nm
Gap: Approx.1 mm
Rear side: The half shells are attached.
Check the condition and function of spindle centring (run-on
delay) , tighten if required. Ensure that the interior side of the
half shells contact the spindle. If required, rework the cut edg-
es of the half shells with a file (do not saw!)
If spindle centring can no longer be adjusted, exchange the
half shells.
The fastening screws of the hose clamps are located at the
height of the gap.
Half shells if required,
can only be filed and
not sawn!
Check spindle centring.
Manually set (without torque wrench)
Place one hand on the spindle and turn it slightly back and
forth.
During this with a T-wrench, turn the hose clamp until the back
and forth of the spindle is only possible with high force.
Once is the case, place the second hand on the spindle.
When the spindle can be moved well but is taut with both
hands, then spindle centring is properly set.
Before starting other work, do the same procedure on the
second column.
Once it has been determined that at no point in time is a
higher effort required to turn the spindle by hand, then the
cut surfaces of the spindle centring must be reworked or the
half shells exchanged.
Check the lifting arm block and gear for wear. Exchange
both components if there is visible damage.