Beretta Mynute Green E 25 C.S.I. Manual Para El Instalador Y El Usuario página 17

Ocultar thumbs Ver también para Mynute Green E 25 C.S.I.:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

USER
EN
A -
GENERAL WARNINGS
The instruction manual is an integral part of the product and it must
therefore be kept carefully and must accompany the appliance; if the
manual is lost or damaged, another copy must be requested from the
Technical Assistance Service.
The instruction manual is an integral part of the product and
it must therefore be kept carefully and must accompany the
appliance; if the manual is lost or damaged, another copy must
be requested from the Technical Assistance Service.
This boiler may only be installed and serviced by qualified per-
sonnel who comply with the national and local current regula-
tions according to Ministerial Decree 37 of 2008 and in compli-
ance with UNI-CIG 7129 and 7131 standards and as updated
and amended.
For the installation, you are advised to contact specialised per-
sonnel.
The boiler must only be used for the application foreseen by
the manufacturer. The manufacturer shall not be liable for any
damage to persons, animals or property due to errors in instal-
lation, calibration, maintenance or due to improper use.
The safety and automatic adjustment devices must not be
modified, during the system life cycle, by the manufacturer or
supplier.
This appliance produces hot water, therefore it must be con-
nected to a heating system and/or a domestic hot water mains,
compatible with its performance and output.
In case of water leakage, close the water supply and contact
the Technical Assistance Service immediately.
In case of absence for long periods time, close the gas supply
and switch off the electrical supply main switch. If there is a risk
of frost, drain the boiler.
From time to time check that the operating pressure of the hy-
draulic system does not decrease under 1 bar.
In case of failure and/or malfunctioning, deactivate the appli-
ance, and do not try to repair or intervene directly on it.
Appliance maintenance must be carried out at least once a
year: scheduling it with the Technical Assistance Service will
avoid wasting time and money.
Based on D.P.R. 16 April 2013 No. 74 the qualified engineer
pursuant to Ministerial Decree 22 January 2008 No. 37 (install-
ing or servicing company), must establish the requirements
and frequency of the inspection operations and any system
service in order to guarantee the required safety. In the ab-
sence of these, the manufacturer's indications will prevail.
At the end of its life, the product should be not be disposed of
as solid urban waste, but rather it should be handed over to a
differentiated waste collection centre.
B - FOR YOUR SAFETY
Boiler use requires to strictly observe some basic safety rules:
Do not use the appliance in any manner other than its intended
purpose.
It is dangerous to touch the appliance with wet or damp body
parts and/or in bare feet.
Under no circumstances cover the intake grids, dissipation
grids and ventilation vents in the installation room with cloths,
paper or any other material.
Do not activate electrical switches, telephone or any other ob-
ject that causes sparks if there is a smell of gas. Ventilate the
room by opening doors and windows and close the gas central
tap.
Do not place anything in the boiler.
Do not perform any cleaning operation if the appliance is not
disconnected from the main power supply.
Do not cover or reduce ventilation opening of the room where
the generator is installed.
Do not leave containers and inflammable products in the instal-
lation room.
Do not attempt to repair the appliance in case of failure and/or
malfunctioning.
It is dangerous to pull or twist the electric cables.
it is forbidden to intervene on sealed elements.
Children or unskilled persons must not use the appliance.
It is forbidden to obstruct the condensate outlet.
For better use, remember that:
- a periodic external cleaning with soapy water not only im-
proves its aesthetic aspect but also preserves panelling from
corrosion, extending its life cycle;
- if the wall-mounted boiler is enclosed in pendant furniture,
leave at least 5 cm for ventilation and maintenance;
- installation of an ambient thermostat will favour a greater
comfort, a more rational use of the heat and energy saving;
the boiler can also be connected to a programming clock in
order to manage ignition and switching off during the day or
week.
C - IGNITION
Activation of the boiler's Statutory Warranty must be carried out by
the Technical Assistance Service.
At the same time, if it is necessary to put the appliance in service
again, carefully follow the described operations.
Each time the boiler is electrically powered, it begins an automatic
venting cycle that lasts about 2 minutes. During this phase the
symbol will appear on the display (fig. 25).
To start-up the boiler it is necessary to carry out the following oper-
ations:
- electrically power the boiler;
- open the gas tap present in the system to allow fuel flow;
- adjust the ambient thermostat to the required temperature (~20°C);
- turn the mode selector to the desired position.
Winter
Turning the mode selector within the area marked with + and - (fig.
27) the boiler provides domestic hot water and heating.
The boiler lights automatically in response to a heat request.
The digital monitor (5) indicates the heating water temperature (fig.
28).
The boiler ignites automatically in response to a request for domestic
hot water and the display (5) indicates the domestic hot water tem-
perature (fig. 29).
Adjusting the heating water temperature
To adjust the heating water temperature, turn the knob with the
"
" symbol (fig. 27) so that it is within the area marked with
+ and -.
Mynute Green E C.S.I.
17
Tabla de contenido
loading

Este manual también es adecuado para:

Mynute green e 30 c.s.i.

Tabla de contenido