INSTALLATION
14. Specification
14.1 Dimensions and connections
(27.4 cm)
10
CK 150-1 Trend / CK 200-2 Trend
g01
Air intake
g02
Air discharge
g03
Strain relief clamp / cable entry
8
| CK 150-1 / 200-2 Trend
(13.1 cm)
5
g01
g02
8 (20.2 cm)
g03
14.2 Minimum clearances to hard surfaces
ANY HARD SURFACE
minimum
4 (10 cm)
minimum 4 (10 cm) recommended 6-8 (15-20 cm)
The images above show minimum allowed clearances be-
tween the installed heater and any hard surfaces.
We recommend installing the heater 6-8˝ (15-20 cm) off the
floor.
CAUTION: Injury
!
Maintain the minimum clearances.
minimum 12
(30.5 cm)
minimum
4 (10 cm)
FLOOR
minimum
20 (50 cm)
FLOOR
www.stiebel-eltron-usa.com