Husqvarna YTH24V48 Manual De Operario página 23

Ocultar thumbs Ver también para YTH24V48:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

SERVICE AND ADJUSTMENTS
TO REPLACE MOWER BLADE DRIVE BELT
(See Fig. 38)
MOWER DRIVE BELT REMOVAL
Park tractor on a level surface. En gage parking brake.
Lower attachment lift lever to its lowest position.
Disengage belt tension rod (K) from lock bracket (L).
CAUTION: Belt tension rod is spring
loaded. Have a firm grip on rod and
release slowly.
Remove screws (P) from mandrel covers (Q) and
remove covers.
Remove any dirt or grass clippings which may have
accumulated around mandrels and entire upper deck
surface.
Remove belt from electric clutch pulley (M), both man-
drel pulleys (R) and all idler pulleys (V).
MOWER DRIVE BELT INSTALLATION
Install belt around all mandrel pulleys (R) and around
idler pulleys (V) as shown.
Install belt onto electric clutch pulley (M).
IMPORTANT: Check belt for proper routing in all mower
pulley grooves.
Reassemble mandrel covers (Q). Securely tighten all
screws.
Engage belt tension rod (K) on locking bracket (L).
CAUTION: Belt tension rod is spring
loaded. Have a tight grip on rod and
engage slowly.
Raise attachment lift lever to highest position.
P
L
K
V
R
TO REPLACE MOTION DRIVE BELT
(See Fig. 39)
Park the tractor on level surface. En gage parking brake.
For as sis tance, there is a belt installation guide decal on
bottom side of left footrest.
Q
P
M
R
R
Fig. 38
BELT REMOVAL -
1. Remove mower (See "TO REMOVE MOWER" section
in this manual).
NOTE: Observe entire motion drive belt and position of all
belt guides and keepers.
2. Disconnect clutch wire harness (A).
3. Remove anti-rotation link (B) on right side of tractor.
4. Remove belt from stationary idler (C) and clutching idler (D).
5. Remove belt from centerspan idler (E).
6. Pull belt slack toward rear of trac tor. Carefully remove
belt up wards from trans mis sion input pulley and over
cooling fan blades (F).
7. Remove belt downward from engine pulley and around
electric clutch (G).
8. Slide belt toward rear of tractor, off the steering plate
(H) and remove from tractor.
BELT INSTALLATION -
1. Install new belt from tractor rear to front, over the steer-
ing plate (H) and above clutch brake pedal shaft (J).
2. Pull belt toward front of tractor and roll belt around
electric clutch and onto engine pulley (G).
3. Pull belt toward rear of tractor. Carefully work belt down
around transmission cooling fan and onto the input pul-
ley (F). Be sure belt is inside the belt keeper.
4. Install belt on centerspan idler (E).
5. Install belt through stationary idler (C) and clutch ing
idler (D).
6. Reinstall anti-rotation link (B) on right side of tractor.
Tighten securely.
7. Reconnect clutch harness (A).
8. Make sure belt is in all pulley grooves and in side all belt
guides and keep ers.
9. Install mower (See "TO INSTALL MOWER" section in
this manual).
Q
B
D
23
A
C
E
F
02953
electric
Fig. 39
G
H
J

Capítulos

Tabla de contenido
loading

Tabla de contenido