Cattani TURBO-JET 1 Manual De Instrucciónes Reservado A Los Técnicos página 116

Equipos centralizados de aire y húmedo
Ocultar thumbs Ver también para TURBO-JET 1:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

"B"
TABLE
Dry centralized plant
Number of surgeries
working simultaneously
1
2
3
5
Examples with units coupled in parallel
Number of surgeries
working simultaneously
3
6
9
10
30
(1) All surgeries working simultaneously with the terminal No. 16 with tip No. 17 or 21 inserted.
(2) The control panel needed is one only, single-three-phase or electronic version.
(3) Sections of pipes are those of the tubes on the market, inside dimensions can be from 2
to 4 mm larger or smaller. The difference does not affect the good running of the plant.
(E) Electronical version. The installation of the electronic P.B. is completed by a peripheral
unit.
Control Panels
Aspiration unit
M
~
-
0035
Uni-Jet 75 2V
C 74
C 73
Tecno-Jet 2V
C 58
Flux-Jet 2V
C 82
Medio-Jet 2V
Control Panels
Aspiration unit
2 Tecno-Jet 2V
C 75
C 75/1
2 Flux-Jet 2V
C 59/E
3 Flux-Jet 2V
C 60/E
2 Medio-Jet 2V
C 83/E
3 Maxi-Jet 2S
C 84/E
Main duct
Section
Max. Distance
(2)
mm (3)
30
40
-
50
-
60
Main duct
Section
Max. Dist.
M
(2)
~
mm (3)
40
-
60
-
70
-
70
-
100
82
Branches
Section
Max. Distance
mm
m.
15
30
20
30
25
30
30
30
Branches
Section
Max. Dist.
mm
m
20
30
30
30
35
30
40
30
40
30
m.
6
6
6
6
m
6
6
6
6
6

Hide quick links:

Tabla de contenido
loading

Tabla de contenido