TABLE
Dry centralized plant
Number of surgeries
working simultaneously
1
1
3
4
7
12
Examples with units installed in parallel
Number of surgeries
working simultaneously
2
6
8
12
14
36
(1) All surgeries working simultaneously with the terminal No. 16 with tip No. 17 or 21 inserted.
(2) The control panel needed is one only, single-three-phase or electronic version.
(3) Sections of pipes are those of the tubes on the market, inside dimensions can be from 2
to 4 mm larger or smaller. The difference does not affect the good running of the plant.
(E) Electronical version. The installation of the electronic P.B. is completed by a peripheral
unit.
Control Panels
Aspiration unit
M
~
Uni-Jet 75
-
AC 13
Mini-Jet 2V
C 86
C 86/1
Tecno-Jet
C 93
C 93/1
Flux-Jet
C 74
C 73
C 58
Medio-Jet
Maxi-Jet 2S
C 82
Control Panels
Aspiration unit
M
~
C 87
2 Mini-Jet 2V
C 87/1
C 94
2 Tecno-Jet
C 94/1
C 75
C 75/1
2 Flux-Jet
C 75/1/E
C 75/E
C 77/E
3 Flux-Jet
C 77/1/E
C 59/E
2 Medio-Jet
C 94/E
3 Maxi-Jet 2S
Main duct
Section
Max. Distance
(2)
mm (3)
m.
30
8
30
10
40
10
50
15
-
60
20
-
80
30
Main duct
Max. Distance
Section
(2)
m.
mm (3)
40
15
50
15
60
20
70
25
-
90
30
-
100
40
81
Branches
Section
Max. Distance
mm
m.
30
4
30
4
30
4
30
4
30
4
30
4
Branches
Section
Max. Distance
mm
m.
30
4
30
4
30
4
30
4
30
4
30
4