3.
f orceIQ
c ontrol
u nit
3.1
I nstallation
1. At
t he
r ear
o f
t he
c ontrol
u nit
y ou
h ave
t o
a ssemble
4
e nclosure
b rackets
b efore
m ounting
i t
t o
the
w all.
U se
t he
f our
s mall
5 x12
s crews.
2. Mount
t he
C ontrol
u nit
a pprox.
1 .7m
a bove
t he
f loor
( measured
f rom
t he
u pper
s ide
o f
t he
box).
3. Connect
t he
c ables
f rom
t he
d oor
l eaf
a nd
t he
d rive
u nit,
a ccording
i n
t he
i nstructions
b y
t he
wiring
d iagram.
T he
c ontrol
u nit
i s
n ow
a ssembled
a nd
r eady
t o
b e
f unctionally
i nstalled.
S ee
paragraph
" Programming"
c oncerning
t he
p rogramming
p rocedure.
4. Check
t he
c ontrol
b oard
o f
t he
F orceIQ
i f
i t
i s
p repared
f or
2 30V
o r
4 00V
o perator.
S ee
n ext
page
f or
t he
r ight
p reparation.
1
www.flexiforce.com
manual – forceIQ
8
8