4.
NOTES FOR USERS AND MAINTENANCE
TECHNICIANS
Compliance with Machinery Directive 2006/42 CEE,
i
once you have installed the equipment, you must
compile a Declaration of Conformity and a Scheduled
Maintenance Plan in compliance with the Machinery
Directive and then hand over copies of these
documents to the user.
4.1
Correct use of the operator
The operator is designed for use on swing gates for
intensive and continuous residential shared use, with a
maximum number of 700 opening/closings per day (for
FORTY 5500-4M) / 600 opening/closings per day (for FORTY
5500-7M).
Carefully read the Warning and Safety standard provided.
4.2
E
mergency release system for manual operation
In the event of mains power supply failure or malfunction,
the operator must be released so the gate can be moved
manually (
fi g.15).
In any case, the manual release/relock operations, must
!
be carried with electrical power disconnected.
•
OPEN the sliding cover of the operator casing:
ONLY
VERSION
press lightly and slide it.
4M
•
Lift the round cap of the lock to enter the unlocking key.
•
Turn 180 ° counterclockwise the supplied release key to
unlock.
•
When the gate has been opened or closed as required, the
operator must be locked again by turning the key through
180° in an clockwise direction.
Remove the release key after use and close the round
!
cap of the lock.
Always close the sliding cover of the operator
ONLY
casing at the end of each release/relock
VERSION
operation.
4M
4.3
Routine maintenance
You should ask the company that installs the automation to
provide a scheduled maintenance plan in compliance with
the regulations for this type of equipment.
The maintenance recommended by Aprimatic S.p.A. for the
lock parts is listed in the tab.3.
Before doing any maintenance job, turn the operator off
!
by means of the differential switch of the electric system.
FORTY 5500
- 19 -
OPERATOR FOR SWING GATES
fi g. 15 -
Emergency release for manual operation
180°
!
tab. 3 -
OPERATION
CHECK THE STRENGTH AND STABILITY OF THE GATE
;
STRUCTURE
CHECK THE HINGES ON THE GATE AND
ENSURE THEY ARE PROPERLY LUBRICATED
CHECK THE MECHANICAL RESISTANCE OF HINGES
TOR COUPLINGS AND LIMIT STOPS
AND REAR MOUNTING PIVOTS OF EACH OPERATOR USING
.
GRAPHITIZED GREASE
CHECK THE OPERATION OF THE SYSTEM
THE MANUAL EMERGENCY RELEASE AND THE HYDRAULIC
LOCK ARE WORKING PROPERLY
CHECK THE SETTING OF THE MAX PRESSURE VALVE
CHECK THE OIL CHARACTERISTICS IN THE SYSTEM
RECOMMEND THE OIL REPLACEMENT IN ANY EVENT NO
.
12/18
LATER THAN
MONTHS
Use exclusively AprimOil.
!
ENSURE THE ELECTRICAL SYSTEM
TIONS AND THE DIFFERENTIAL SWITCH ARE EFFICIENT
CLEAN THE STRIKER PLATE OF THE ELECTRIC LOCK
(
).
WHERE INSTALLED
Recommended maintenance
INTERVAL
EVERY
MONTHS
.
,
-
OPERA
EVERY
;
LUBRICATE THE FRONT
MONTHS
;
CHECK THAT
EVERY
MONTHS
.
.
EVERY
MONTHS
-
WE
EVERY
MONTHS
,
-
THE EARTH CONNEC
EVERY
.
MONTHS
EVERY
MONTHS
12
6
6
6
6
6
6