INSTALLATION PROCEDURE
body, use the hose joint provided. Connect the
hose. (Not inluded, 1/2 ID)
Be sure to thorougly flush the supply pipes of
dirt and debris. Shut off the water supply at the
stop valve after flushing.
Hose Joint
1/2" ID Hose
(not included)
Durability Test
4. Conduct a durability (pressure) test, make sure
that no water leaks from the pipe connections
and set the plaster guard. The pressure can be
applied at a maximum 230 psi (1,6 MPa, static)
for up to 1 min.
Finishing the floor
Finish the floor so that it is within the finishing
range indicated on the side of the plaster guard.
Pay attention not to get mortar, etc. inside of the
plaster guard.
inches(mm)
MAX
MIN
5