Installation checklist
Checklist
Check the mechanical and electrical installation of the drive before start-up. Go
through the checklist below together with another person. Read chapter
the first pages of this manual before you work on the drive.
Check
MECHANICAL INSTALLATION
The ambient operating conditions are allowed. (See
for the installation site
Power cable sizes and fuses
The drive is fixed properly on an even vertical non-flammable wall. (See
installation.)
The cooling air will flow freely. (See
page 35.)
The motor and the driven equipment are ready for start. (See Planning electrical installation:
Motor selection in the ACS355 user's manual and
page 53.)
There are no foreign objects inside the drive. Only installations instructed in this manual or
the ACS355 user's manual are allowed.
ELECTRICAL INSTALLATION (See Planning electrical installation and
For ungrounded and corner grounded systems: The internal EMC filter is disconnected
(EMC screw removed).
The capacitors are reformed if the drive has been stored over two years.
The drive is grounded properly. Note: Lead-throughs may not be used for grounding.
The input power voltage matches the drive nominal input voltage.
The input power connections at U1, V1 and W1 are OK and tightened with the correct torque.
Appropriate input power fuses and disconnector are installed.
The motor connections at U2, V2 and W2 are OK and tightened with the correct torque.
The motor cable is routed away from other cables.
The external control (I/O) connections are OK.
The input power voltage cannot be applied to the output of the drive (with a bypass
connection).
on page 35,
Technical
on page
52
and
Mechanical
Mechanical installation: Requirements
data:
Cooling air flow requirements
Ambient conditions
installation:
Free space around the drive
Technical
data:
Safety
on page 51,
on page 54.)
Mechanical
Motor connection
on
Electrical
installation.)
Installation checklist
43
on
on