EdilKamin FANTASY Instalación Uso Y Mantenimiento página 34

Ocultar thumbs Ver también para FANTASY:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 72
1st SOLUTION: IT 11 (code 6
Note: THE PIPES ON THE HOT AIR OUTLETS MUST BE FITTE BEFORE APPLYING THE CO ERINGS AN
PRIOR TO ISASSEMBLY OF THE UPPER CAST IRON SI E FLAN . THE FIRST PART OF THE FLEXIBLE
PIPE MUST BE COMPLETELY RELAXE
THE INTERNAL IAMETER
- e ne the position of the stove with respect to the walling ( g. a).
- isassemble the upper part of the bac (
pipes ( g. b).
- ctivate the hot air channelling control lever ( ), removing the loc ing plate (
- ut the ue cover to size ( ) on the wall side ( g.c)
- lace the stove in its de nite position.
- E tend the aluminium pipe ( ) for hot air channelling, without connecting the stove outlet.
- Fit the medallion ( ) on the aluminium pipe and the pipe cover ( a) without loc ing it in ( g. c).
- Fit the aluminium pipe to the hot air outlet on the bac of the stove ( ) ( g. d).
- Replace the upper part of the bac (
- lace the pipe cover ( ) in the de nite position and fasten it to the bac of the stove with the supplied screws (7) ( g. d).
- nstall the terminal outlet ( ) and its aluminium pipe ( ) ( g. d).
- Fasten the wall medallion ( ) with silicone ( g d).
g. a
g. c
6a
6
g. d
8
o
pipe
Smo e outlet end-piece
all medallion
a
Flue cover
7
Flue cover fastening screws
ipe bloc ing clamp
INSTALLATION
) - A
IN SUCH A AY TO ELIMINATE CORRUGATION. IN THIS
ILL BE SLIGHTLY ENLARGE TO FA OUR ENTRANCE.
) and remove one of the two predrilled caps in correspondence with the hot air outlet
).
g. b
3
2
5
8
8
5
4
4
7
6
6a
ACENT ROOM ONLY
) ( g. b).
132
133
13
132
4
8
5
3
6
- 34
-
AY
1
5
4
7
3
6
6a
8
n
7
9
9
7
Tabla de contenido
loading

Este manual también es adecuado para:

FataSirenaStory

Tabla de contenido