EdilKamin INPELLET 49 Instalación Uso Y Mantenimiento página 30

Ocultar thumbs Ver también para INPELLET 49:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 59
FACILITATION KIT FOR INSTALLATION
omposition:
B) base plate
C) smo e channel centring brac et
E) Pellet loading tube centring brac et
ssemble the facilitation it as shown in gure .
If installing in e isting replaces, it is recommended that an
8 mm diameter steel chimney ue be placed in the e isting
chimney ue.
In the same case, it is essential to completely bloc the resul-
ting space between the new stainless steel chimney ue and the
old masonry chimney ue with several layers of ceramic bre
padding or another similar material (see g. 8 letter G).
Install the base plate (B) of the it in the position where
INPELLET 49 will be placed ( g. 4). Secure the plate (B) with
the bolts provided.
Fit the chimney ue on the collar of the brac et (C) placing it
on the dedicated screws ( ) ( g. ).
Fit the pellet loading tube on the collar of the brac et collar
(E g. to the side and g. on pg. 8), securing it with the
clamp supplied.
Position INPELLET 49 sliding it along the plate (B) until it
reaches end-of-travel ( g. ).
Through the opening (H) set on top of INPELLET 49, re-
move the support screw ( ) and t the smo e channel onto the
smo e outlet (F), bloc ing it in place with the screw ( ) and
sealing with high temperature mastic ( g. ).
g. 8
G
INSTALLATION
g. 4
g.
g.
g.
mat
steel rod
- 30
-
B
E
*
B
B
*
F
H
C
C
D
Tabla de contenido
loading

Tabla de contenido