c)
Figure 34 – Placing the storage unit next to the boiler (a); connecting the storage
unit to the boiler's pellet tank (b e c)
7 – To make the fixing of the storage unit to the boiler you will have to remove the
upper lids of the storage unit. Remove the 2 screws at the back (Figura 35-a); open
the front lid and remove the 3 screws that secure the lids to the central bar (Figura
35-c).
a)
b)
52