ENGLISH
IMPORTANT: The instruction manual you are holding includes essential information on the safety measures to be im-
plemented for installation and start-up. Therefore, the installer as well as the user must read the instructions before
beginning installation and start-up.
Keep this manual for future reference.
To achieve optimum performance of the Underwater LumiPlus Projector for fountains, follow the instructions provided
below:
1. VERIFY THE CONTENTS OF THE PACKING:
The following accessories are included inside the box:
• Projector unit
• Installation and maintenance manual
2. GENERAL CHARACTERISTICS:
This projector has been designed to be used totally submerged in water. It is a Class III electric apparatus with very low
safety voltage (12V with alternating current).
The projector compiles with IPX8 degree of protection (resistance to penetration of dust, solid bodies and humidity) at a
nominal immersion depth of 2 m.
This projector compiles with international safety standards for lights, especially the EN 60598-2-18 standard. LIGHTS
PART 2: SPECIFIC REQUIREMENTS SECTION 18 LIGHTS FOR SWIMMING POOLS AND SIMILAR APPLICATIONS.
The manufacturer is not responsible in any circumstances for assembly, installation or start-up of any electric components
which have been inserted or handled at locations other than its own premises.
3. INSTALLATION:
• To correctly light the instalation we recommend you:
Install a projector in the range LumiPlus 1.11 every 20 m
Install a projector in the range LumiPlus 2.0 every 25 m
Note: Recommendation valid for instalation base with light colours. In darker colours or stainless steel installation bases
we recommend oversizing the proportion of projectors per m².
• External connections of the projectors must be made within watertight junction boxes completely. In its absence, the
joints must be properly sealed so as to ensure that no water leakage may occur inside the projector through the cables.
For this is recommended to use underwater resin splicing. It is not recommended to use silicone to try to seal the con-
nection point of the wires. The spotlight should not be handled under any circumstances as this would lead to losing the
guarantee.
4. ASSEMBLY:
Follow these steps for installation:
1. Make 3 holes in the bottom of the fountain (Fig. 1)
2. Place the base of the holder and fasten the three screws (Fig. 2)
3. Place the projector on the holder and adjust the projection inclination with screws A and B (Fig.3).
5. SAFETY WARNINGS:
• People in charge of assembly should be suitably qualified for this type of work.
• Avoid making contact with the electric voltage.
• Comply with the current standards regarding accident prevention.
• In this regard, the IEC 364-7-702 standards must be observed: WIRING IN BUILDINGS SPECIAL WIRING SWIMMING
POOLS.
• All maintenance operations should be performed with the projector disconnected from the Mains.
• Do not handle with wet feet.
• Projector holder unit
• Manual for electrical connection • Warranty booklet
MODELS AVAILABLE ACCORDING TO CHARACTERISTICS
LumiPlus 2.0
Light
Code
45635
RGB
45636
Monocolour
45648
RGB-DMX
LumiPlus 1.11
Light
Code
56008
RGB
52607
Monocolour
56009
RGB-DMX
2
of water surface.
2
of water surface.
2
• Bag of fastenings