2.5.1. REPLACEMENT OF INJECTORS FOR MAIN BURNERS
-
To reach the injectors, remove the control panel after having removed the knob of the
water inlet tap and the handwheel vat tilting.
2.5.2. REPLACEMENT OF INJECTORS FOR PILOT BURNER
-
Unloose the screw (E), replace the injector (D) with an appropriate one (see table 3).
-
With a size 12 key unscrew the injector and replace it with a suitable one (see table 3).
Control the correct distance "H" for primary air (see paragraph "Control of primary air
-
flow").
ATTENTION !:After each conversion the appliance must be controlled to make
sure that there are no leakages and that it operates correctly.
2.6. MAINTENANCE OF THE APPLIANCE
Warning! : All maintenance operations shall only be performed by a technically
qualified service centre!
− To ensure correct and safe operation, the appliance must be inspected and serviced at
least once a year only. Maintenance includes also to control the components and tear
of pipes, feeding pipes etc..
It is advisable to replace worn components during maintenance operations to avoid the
need for other maintenance calls and unexpected failures.
− It is also advisable to apply for a maintenance contract with the customer.
Instruction manual for installation, maintenance and use
Gas tilting bratt pans Serie 700
- GB -
15 di 29
Page