Installation Instructions; Step 1 - Unpack Wine Cellar; Step 2 - Make Electrical Connection; Step 3 - Level Wine Cellar - Haier HEWFT36BXB Manual Del Usuario

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

INSTALLATION INSTRUCTIONS

STEP 1 - UNPACK WINE CELLAR

Use two or more people to move and install wine cellar.
Failure to do so can result in back or other injury.
1.
Remove all packaging material. This includes the foam base and all adhesive
tape holding the wine cellar accessories inside and outside.
2.
Inspect and remove any remains of packing, tape or printed materials before
turning on the wine cellar.
3.
Dispose of/recycle all packaging materials.

STEP 2 - MAKE ELECTRICAL CONNECTION

Plug into a grounded 3 prong outlet.
Do not remove the ground prong from the power cord plug.
Do not use an adapter.
Do not use an extension cord.
Failure to do so can result in death, fire or electrical shock.
1.
Move the wine cellar to your desired location.
2.
Plug into a grounded 3 prong outlet.

STEP 3 - LEVEL WINE CELLAR

The wine cellar has four leveling legs, one leveling leg in each corner.
After placing your wine cellar in the desired location, make sure that it is level from
front to back and side to side.
The leveling legs can be adjusted by turning them clockwise to raise or
counterclockwise to lower.
NOTE:
The wine cellar door will close easier when the front leveling legs are
extended.
WARNING
Excessive Weight Hazard
WARNING
Electrical Shock Hazard
6

Capítulos

Tabla de contenido
loading

Tabla de contenido