Proteco Ace TA Manual De Uso E Instalación página 11

Idiomas disponibles
  • ES

Idiomas disponibles

SAFETY CRITERIA
1
Attention: before beginning the installation it is absolutely necessary to read all this
manual.
2
Verify that the technical features of the actuator fit your installation needs.
3
Moreover verify that:
• The gate hinges are in good conditions and perfectly lubricated.
• The gate has mechanical stops in opening and closing.
INSTALLATION ADVICE
Connections:
See the "Functional Scheme" and refer to the control board scheme.
The electric cable which exits from the actuator must not be tight, but it has to do an
ample curve towards the bottom in order to avoid water reflux inside the actuator.
(Fig. O)
All connections must be done when the device has no power supply.
You may need a omni polar breaking device (the cables must measure at least 3
mm) Always protect the power supply using a 6A automatic switch, or a 16A single-
phase switch with fuses.
The power supply lines to the motors, to the control unit and to the accessories must
be separated to avoid interferences which could generate problems to the system.
Any equipment (either of control or safety) in case connected to the control unit must
be tension free.
Spare parts:
Use original spare parts exclusively.
Get rid of batteries putting them with industrial rubbish and not with domestic
rubbish . (Law n. 475/88)
Installation:
In order to correctly use the product and to exclude the possibility of injury or
damage, refer to the "General instructions" page, which is a part of this manual.
The use of this equipment must observe the safety standards in force in the country
where it is installed, as well as the standards governing proper installation.
Warranty:
The warranty given by the manufacturer becomes invalid in cases of: tampering,
carelessness, improper use, lightening damage, power surges or use by
unqualified personnel.
The warranty will also become invalid in the following cases:
If the instructions given in the manuals supplied with the product are not respected.
The application of a part in a manner different from current legislation or the use of
spare parts which are unsuitable and/or not approved by manufacturer.
The manufacturer cannot be considered responsible for damages due to improper
or unreasonable use.
INSTALLATION INSTRUCTION SEQUENCE
1
Before starting the installation, analyse the risks referring to the chapter "General
instructions", which is part of this manual, fill in the technical table and eliminate
the risks.
In case there are still some risks, use security systems during installation.
2
Verify the security laws written in the chapter "Security Criteria" in "General
instructions".
3
Control all the components.
4
Identify the fixing point on the pillar and on the gate.
5
Verify measure "D".
6
Adjust brackets S1 or S2 as needed
7
Fix the actuator to the bracket S1 o S2.
8
Release the actuator.
9
Fix the brackets S3 o S4 to the gate.
10 Fix the final part of the actuator TI (piece n. 35 in the list of parts) to the bracket S3
or the driving pivot of the actuator TA to the bracket S4.
11 Stretch the cables as in the "Functional scheme".
12 Connect the control unit and all accessories.
13 Program the radio receiver.
14 Program the "WORKING TIMES"
In case of anomalies, see the chapter "Anomalies and Suggestions" in "General
instructions"
If you do not find any solution call the nearest Assistance Centre.
BLOCKED ACTUATOR
The actuators are blocked.
The electric lock must be installed on the wing that opens first and must be connected
with the terminals of the control unit.
Position of the electric lock: (Fig. C).
Position 1: Lock between the wings.
(in this case it is necessary to use the bolt RT15 on the second wing)
Position 2: Lock on the floor.
( In this case the use of the bolt is not essential)
Remember to remove the lock of the gate (or at least leave the lock in open position) and
take away all the bolts.
RIGHT OR LEFT ACTUATORS (Fig. D)
The motors are supplied in one version, suitable to both left or right installation.
HOW TO DETERMINE FIXING MEASURES
Gate fixed in the middle of the pillar
In this case the maximum opening angle of the gate is 90°.
The best thing to do is to put the fixing brackets at the measures indicated in the table
above picture A and B .
These quotes are calculated in order to obtain an average tangential speed that does not
exceed 12 m/minute
.
Gate fixed on the edge pillar
In this case the gate can open with an angle superior to 90° (max. 120°)
-
The best thing to do is to put the fixing brackets at the measures indicated in the
table above picture A and B.
-
To make the wing open with a bigger angle, measure A must be superior to
measure B.
The best solution can be obtained increasing measure A of the same dimension of
which measure B must be diminished.
.
(Fig. A)
(Fig. B)
loading

Este manual también es adecuado para:

Ace ti