Delivery Of The Boiler; Installation Of The Heating Boiler; Requirements; Assembly / Disassembly Of The Boiler Housing - Sunsystem BURNIT WBS Serie Manual Del Operador

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

Diagram 3. Overall dimensions of boiler body
and pallet, model WBS /see page 55/
EN
Model A, mm B, mm C, mm D, mm
WBS 20
560
WBS 25
560
WBS 30
560
WBS 40
660
WBS 50
660
WBS 70
720
WBS 90
720
WBS 110
780

5. DELIVERY OF THE BOILER

• I nspect the integrity of the packaging upon
delivery.
• C heck whether all components have been
delivered to you. Boiler scope of delivery includes:
1) Boiler body with boiler doors
2) Safety valve 3 bar
3) Fire irons
4) Cleaning brush for flue pipes
5) Technical passport. Installation and operation
manual
6) Service booklet and Warranty card
If any of the above items are missing, contact your
supplier.

6. INSTALLATION OF THE HEATING BOILER

The assembly, installation and setup of
boiler must be performed by a technician
*
authorized for such operations.
Installer must indicate to the user of the
installation the minimum clearances from
flammable materials and liquids.

6.1. Requirements:

- B oiler room must be frost-proof;
- B oiler room must allow for continuous access of air
necessary to maintain combustion;
- B oilers must not be placed in inhabitable rooms;
- A ll boiler rooms must have correctly calculated vent
depending on the boiler output. The vent must be
protected by means of a net or grate.
The size of the vent is calculated according to the
formula:
А = 6,02 * Q - where:
TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL
Table 3.
1020
125
1225
1020
125
1225
1020
125
1225
1080
125
1225
1080
125
1225
1200
125
1375
1200
125
1375
1200
125
1375
А – area of the vent in cm
Q – boiler output in kW
- R emove the packaging without polluting the
environment
Weight,
- O bserve building supervision instructions, in
kg
particular the existing Ordinance on combustion
devices and storage of combustion materials, on
210
building requirements applicable to installation sites
230
and on ventilation;
250
- T he boiler must be placed on a foundation whose
surface area is larger than the base of the heating
290
boiler according to diagram 1;
315
- T he boiler must be placed in a position which allows
385
for the easiest possible cleaning and servicing;
- I nstallation must be carried out according to
420
installation diagram 1 which shows the boiler
450
housing;
- N o objects made of flammable materials or liquids
may be placed on/near the boiler;
Steps to assemble the panels of the boiler housing
Fix the side panels 1 to Foundation 6 by
Step 1:
using Rivet М8 х 16 mm – 2 pcs.
Fix the Back panel 2 to Foundation 6 by
using Rivet М8 х 16 mm – 2 pcs. And fix the
Step 2:
the Back panel 2 to Side panels 1 by using
Screw М5 x 16 mm – 2 pcs.
Fix Front lower panel 3 to side panels 1 by
Step 3:
using Screw М5 x 16 mm – 2 pcs.
Fix Front upper panel 4 to side panels 1 by
Step 4:
using Screw М5 x 16 mm – 2 pcs.
Mount thermometer 9 - place the probe 10
Step 5:
into sensor sleeve 11
Fix the Cover panel 5 to side panels 1 by
Step 6:
using Screw М5 x 16 mm – 4 pcs.
* Necessary tool when assembling boiler housing -
screwdriver (screwdriver with cross tip).
Make sure the boiler housing is assembled stable.

6.2. Assembly / disassembly of the boiler housing

Diagram 4. Elements of boiler housing, model
1
Side panel with insulation
2
Back panel with insulation
3
Front lower panel with insulation
4
Front upper panel with insulation
Cover panel and thermometer, with
5
insulation
6
Foundation
7
Screw М5 x 16 mm
6
,
2
WBS /see page 56/
Table 4
Element
pcs
2
1
1
1
1
1
10
Tabla de contenido
loading

Tabla de contenido