Pipe Connection; Installing Heat Insulation; Installing Drain Pipes - Fujitsu Airstage ARXC36GATH Manual De Instalación

Ocultar thumbs Ver también para Airstage ARXC36GATH:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 44

4.3.3. Pipe connection

When the fl are nut is tightened properly by your hand, hold the body side coupling with a
separate spanner, then tighten with a torque wrench.
Hold the torque wrench at its grip, keeping it at a right angle with the pipe, in order to
tighten the fl are nut correctly.
Torque wrench
Indoor unit pipe
(Body side)
Be sure to install the pipe against the port on the indoor unit and the outdoor unit
correctly. If the centering is improper, the fl are nut cannot tightened smoothly. If the
fl are nut is forced to turn, the threads will be damaged.
Do not remove the flare nut from the indoor unit pipe until immediately before
connecting the connection pipe.
Do not use mineral oil on fl ared part. Prevent mineral oil from getting into the system
as this would reduce the lifetime of the units.
Flare nut [mm (in.)]
6.35 (1/4) dia.
9.52 (3/8) dia.
12.70 (1/2) dia.
15.88 (5/8) dia.
19.05 (3/4) dia.

4.4. Installing heat insulation

Install the coupler heat insulation after completing the refrigerant leak check (for details,
refer to the Installation Manual for the outdoor unit).
Coupler heat
insulation
(Accessories)
Cable tie (Large)
(Accessories)
There should be no gaps between the insulation and the product.

5. INSTALLING DRAIN PIPES

• Use general hard polyvinyl chloride pipe (VP25) and connect it with adhesive (polyvinyl
chloride) so that there is no leakage.
• The position of the installed drain pipe should have a downward gradient of 1/100 or
more.
• To prevent the pipe from freezing, use a heat insulation material as needed.
En-5
9373870111-01_IM.indb Sec1:5
9373870111-01_IM.indb Sec1:5
CAUTION
Tighten with 2 wrenches.
Holding wrench
Flare nut
Connection pipe
CAUTION
Tightening torque [N·m (kgf·cm)]
16 to 18 (160 to 180)
32 to 42 (320 to 420)
49 to 61 (490 to 610)
63 to 75 (630 to 750)
90 to 110 (900 to 1,100)
Cover this portion with
heat insulation.
Heat insulation
CAUTION
Position of drain piping
139 mm
123 mm
41 mm
Main drain port
Drain pipe
• For main drain port
• For safety drain port
• This product has drain ports in 2 locations. Follow the procedure in the fi gure to connect
drain hose and drain pipes to each of them.
INSTALL THE DRAIN HOSE TO THE MAIN AND SAFETY
DRAIN PORT
Working procedure
(1) Install the attached drain hose to the main and safety drain port of the body. Install
the hose band from the top of the hose within the graphic display area. Secure fi rmly
with the hose band.
(2) Use vinyl adhesive agent to glue the drain piping (PVC pipe VP25) which is prepared
on site or piping socket. (Apply color adhesive agent evenly until the gauge line and
seal)
(3) Check the drainage.
(4) Install the heat insulation.
(5) Use the attached heat insulation to insulate the drain port and band parts of the body.
Ensure there is no space
Drain pan
10 to 15 mm
Applying
area of
Hard PVC side
adhesive
4 mm or less
Wrap the Drain hose insulation around the drain hose connection.
Drain pan
100mm
Safety drain port
O.D.
32 mm (VP25)
Hose Band
(Accessories)
Soft PVC side
Drain hose
(Accessories)
Joint pipe
(Field supply)
Drain pipe (VP25)
(Field supply)
Drain hose insulation
(Accessories)
Drain hose
2012-7-12 14:19:01
2012-7-12 14:19:01
Tabla de contenido
loading

Este manual también es adecuado para:

Airstage arxc45gathAirstage arxc60gath

Tabla de contenido