HOLZMANN MASCHINEN GmbH
www.holzmann-maschinen.at
3. Assembly lubrication tank
4. Assembly operation handle
5. Assembly ON/OFF-switch
6. Put the sawhead on the track and make final
adjustments for ensuring the parallel and
height of the track. Then tighten the screws.
7.
Install the two pieces anti-sway bar on both left
and right machine bracket.
8. Control of the sawblade distance. If this is not
identical on the left and right, it must be
adjusted at the rear handle to either raise or
lower one side.
ASSEMBLY
26
BBS 350