Maintenance Plan; Ec - Declaration Of Conformity - Blitz MW 220 Instrucciones De Uso

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 74
7.1

Maintenance Plan

Interval
Before each operation
Weekly
Semi-Annually
8
EC – Declaration of Conformity
In terms of the EC Machinery Directive 2006/42/EC
We hereby declare that the equipment designated below, due to its design and construction, as well
as the version put on the market by us, conforms to the basic safety and health requirements of the
EC Machinery Directive 2006/42/EC.
Product Designation
Serial number
Year of construction
Relevant EC Directives
Applied harmonized standards
Other applied technological
standards / specifications
Representative for compilation of the relevant technical documents
BlitzRotary GmbH, Hüfinger Str. 55, 78199 Bräunlingen
Location:
03.05.2019
Date:
22
Maintenance action
Checking the correct functioning of the operating elements
Visual inspection for damage and tightness
Maintenance water separator, cleaning
Check castors
Check tight fit of all screws
Check function
Control of compressed air hoses
Sticker, type plate available, legible
Bräunlingen
Mobile Wheel Lift
see nameplate
see nameplate
EC Machinery Directive (2006/42/EC)
DIN EN ISO 12100:2011-03
EN 349:2008-09
DGUV Regel 100-500
_________________
Doris Wochner-McVey
Managing Director
Mobile Wheel Lift
Maintenance Plan
125920
Tabla de contenido
loading

Este manual también es adecuado para:

Mw 90

Tabla de contenido