General Installation Instructions - Waeco PerfectView CRT245 Instrucciones De Montaje Y De Uso

Sistema de vídeo de marcha atrás
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 72
RV-245.book Seite 42 Freitag, 25. November 2005 4:25 16
Installing the monitor
10.1

General installation instructions

Select a suitable installation location (see fig. 6 B and C, page 7).
When selecting the installation location, proceed as follows:
Screw the monitor holder on to the monitor.
Place the monitor and the attached holder in a test position (fig. 6 D, page 7).
Ensure that you have a clear view of the monitor (see fig. 6.B and C, page 7).
The installation location should be flat.
Ensure that the contact area between the monitor holder and the installation base is
as big as possible.
Before the final installation check that there is sufficient room underneath the instal-
lation location to attach the washers and nuts.
Bear in mind the weight of the monitor. Are reinforcements (bigger washers or plates)
needed?
Is it possible to lay the connection cable and extension cable to the the monitor?
When all points have been considered you can start the installation.
10.2
Installing the monitor
Mark the outlines of the corners of the monitor holder on the dashboard.
Unscrew the monitor holder from the monitor.
Hold the monitor holder in the outlines marked beforehand and mark at least four dif-
ferent drilling points (see fig. 6 E, page 7).
Attaching the monitor holder using self-tapping screws
No. in fig. 7, page 8
A
B
When using self-tapping screws to make an attachment:
This should only be done onto sheet steel with a minimum thickness of
1.5 mm.
The following should be observed when making drill holes in sheet metal:
Check beforehand that there is sufficient room for the drill head to emerge
once the holes have been made.
Using a hammer and centre punch, make a small dent to prevent the drill
head from slipping.
Grind all drill holes and provide them with rust-protection.
Drill a hole of Ø 4 mm on the previously marked points.
42
Quan-
Parts required
tity
1
Monitor holder
4
Self-tapping screws 5 x 20 mm
PerfectView CRT245
Tabla de contenido
loading

Tabla de contenido